In a span of two months, Philsouth opened two residential projects in Negros Oriental.
Last October 9 and December 14, 2024, Philsouth opened Westville Heights in Brgy. Palinpinon, Municipality of Valencia, Negros Oriental, and South Plains Subdivision in Brgy. Villareal, Bayawan City, Negros Oriental, respectively, with two model units for viewing and selling to the public. These house-and-lot units, with prices below Php2.5 Million, fall under the category of Economic Housing under BP220.
Fresh from being recognized by Pag-Ibig Fund as the Top 8 Accredited Developer for Visayas last August 9, 2024, and benefiting from its vast experience in practical design and build in the housing industry, with emphasis on quality and affordability, Philsouth is bringing back Single Attached Units with bigger lot area. Interested buyers will truly appreciate having bigger open area as reflected in the two new “dressed-up” single attached units below:
JUNE (Floor Area: 50 | Lot Area: 90)
3 Bedroom | Single Attached | 1 T&B | Complete Unit w/ Tiles
MAY (Floor Area: 41 | Lot Area: 75)
2 Bedroom | Single Attached | 1 T&B | Complete Unit w/ Tiles
Standard turn-over units come complete with tiles and inclusion as follows: Skimcoat and 2 Coats of Final Paint Finish except Firewall; Combination of Sliding Window and Jalousie; Complete Electrical Works with Fixtures and Accessories; Prefab G.I. Kitchen Counter with Faucet and Stainless Sink; Shared Utility Post; 4-Chamber CHB Septic Tank; Fire Extinguisher and Smoke Detector; and Rain Water Collector.
With full accreditation from Pag-Ibig Fund, Landbank of the Philippines, Bank of the Philippine Islands, and other financing institutions, Philsouth ensures a hassle-free homebuying experience with easy financing options.
Interested buyers may refer to the link below for more details.
Westville Heights | South Plains Subdivision |
Economic LS No. 0000857 Advertisement: DHSUD-R7-AA-2024/03-019 Completion Date: February 15, 2029 | Economic LS No. LS-R07-22-053 Advertisement: DHSUD-R7-AA-2022/12-159 Completion Date: July 26, 2026 |